Case Study – Pembroke Dock Marina Project

Earlier this year ABI Equipment Ltd supplied a Delmag RH34 drilling rig to BAM Nuttall for use on the Pembroke Dock Marina Project.  This major infrastructure project is part of the £1.3 billion Swansea Bay City Deal which is developing a world-class centre fro marine engineering and is set to create around 1,800 highly skilled Read More

CaseStudy: High Speed 2, Chiltern Line, West Ruislip

High Speed Two (HS2) is a major rail infrastructure project that will see the building of a new high speed railway line linking London, Birmingham, Leeds and Manchester with connections to the existing rail network.  During the spring of 2021 an ABI TM22 Mobilram and a Delmag RH34 drilling rig worked together to install sheet Read More

Post BAUMA Round-Up plus Technical Specifications

  It’s only been a few days since Managing Director Mark Lee returned from his week at the Bauma trade show in Germany, and he is full of the enthusiasm and energy that this event generates for our industry. This year was no exception, and it’s been reported that this has been the biggest turnout Read More

Season’s Greetings 2018 To All Our Friends And Colleagues

As the end of 2018 draws inevitably closer we can look back on what has been a pretty good year all round for ABI Equipment Ltd, in terms of both innovation and growth. We are fortunate enough to have been involved in some major projects in both the construction and infrastructure sectors, as well as Read More