Case Study – Pembroke Dock Marina Project

Earlier this year ABI Equipment Ltd supplied a Delmag RH34 drilling rig to BAM Nuttall for use on the Pembroke Dock Marina Project.  This major infrastructure project is part of the £1.3 billion Swansea Bay City Deal which is developing a world-class centre fro marine engineering and is set to create around 1,800 highly skilled Read More

CaseStudy – Plastic Sheet Piling

There is a new case study available now in the Case Studies section of our website.  It features the work of our TM14/17VSL and TM13 on two projects for RM McLeod.  Both of these projects took place in Scotland and used plastic sheet piling.  Plastic Sheet piles are ideally suited to water-based applications and the Read More