CaseStudy: Piling for Dawlish Sea Defences

The new sea defences at Dawlish help to protect the stretch of railway line, from Exeter St. David’s to Plymouth, that was washed away during the winter storms of 2004.  During the winter of 2020/21 our Delmag RH34 worked with the team at BAM Nuttall Ltd to install the piling for the project.  The tidal Read More

Case Study : Innovative Use of Wet Soil Mixing Technique

March 2018 saw our compact and versatile ABI Mobilram TM 14/17V rig head down to the Kent coast. This was a three month contract assisting Deep Soil Mixing Ltd (DSM) with their ground improvement works at the St Mary’s Bay redevelopment site. The ABI rig was coupled with a VDW 8360 Double Auger Head for Read More