Case Study : ABI in action at Station Square, North Acton

Last summer we supplied an ABI HPZ635-700 HydroPress attachment to Dawson-WAM to assist with sheet piling works at an urban regeneration project in North Acton, London. The HydroPress was used in conjunction with a range of other ABI machines and equipment, and is a fantastic showcase for the versatility of the brand. Redevelopment in North Read More

Case Study : Delmag RH28 rigs at Woolwich Royal Arsenal

If you are a follower of ABI Equipment Ltd on LinkedIn you will have seen that we sent three Delmag RH28 rigs down to the Woolwich Royal Arsenal redevelopment site last year. This is a premium brown-field site in the heart of our capital city, where ‘new’ land is as rare as hens’ teeth. In Read More

New Mobilram Case Study Published

We have recently published a Case Study report about the involvement of our ABI Mobilram TM 16/20 B telescopic leader rig at the Chelsea Embankment site of the Thames Tideway Tunnel project. We are proud to have been selected to supply machinery and equipment to this and a number of other contstruction sites along this Read More