CaseStudy: Vibro Stone Columns

Vibro stone columns are a ground improvement technique, used to stabilise areas of weak or variable soils or made ground.  During 2021/22 ABI Equipment provided Tritech Ground Engineering with an ABI TM 13 Mobilram for various projects across the UK.  On each occasion the rig was used to install Vibro-Stone Columns.  Each site was treated Read More

CaseStudy: High Speed 2, Chiltern Line, West Ruislip

High Speed Two (HS2) is a major rail infrastructure project that will see the building of a new high speed railway line linking London, Birmingham, Leeds and Manchester with connections to the existing rail network.  During the spring of 2021 an ABI TM22 Mobilram and a Delmag RH34 drilling rig worked together to install sheet Read More

CaseStudy: Piling for Dawlish Sea Defences

The new sea defences at Dawlish help to protect the stretch of railway line, from Exeter St. David’s to Plymouth, that was washed away during the winter storms of 2004.  During the winter of 2020/21 our Delmag RH34 worked with the team at BAM Nuttall Ltd to install the piling for the project.  The tidal Read More

A New Case Study From the English Riviera!

Our latest case study to be published features one of our tough and robust Delmag RH28 drilling rigs, on an off-shore project in Brixham Harbour, Devon. The work required was the drilling of rock socketed piles into hard limestone bedrock, to secure the foundations of a new jetty being built in this fishing town. The Read More

ABI Group News 2018

The 2018 edition of the ABI Group newsletter is out! And guess who is on the front page? ABI Gruppe News is an annual publication (both print and digital) produced by our parent company in Germany.  We are delighted that this year’s issue leads with the news that we, ABI Equipment Ltd, their UK subsidiary Read More