Case Study : Grantham Southern Relief Road

We have just published our latest Case Study – the use of one of our Delmag RH28 drilling rigs for the installation of foundation piles for wing walls and abutments in the latest phase of the Grantham Southern Relief Road, for our client BAM Ritchies. This is part of a major highways upgrade taking place Read More

Piling with Vibration – Specs for our latest generation of vibros

ABI Equipment Ltd offer a wide range of pile driving rigs and attachments. ABI Group are pioneers in the field of piling with vibration, and their patented variable speed/variable frequency “VV” vibrators are universally popular with major construction clients. ABI’s design and development concentrates on high frequency vibrators, meaning that they work above the natural Read More